I am getting the error below in Proclarity:
"Error Accessing Drill To Detail Information
xxxxxxx in dimension Measures is a calculated member."
Can AS2005 support drill through from a calculated member, if not is there a work around?
Thanks
The answer is pretty easy but you might not like it: The drillthough is not supported on the calculated measures or calculated members.
Not sure what would you expect from the drillthoguh into calculated measure or member. Calulated member could be totally unrelated to the facts in your cube. How would you drillthorouh into that? You can definitely can come up with simple case of calc measure being sum of two measures in the same measure group, but that is very narrow and not practical case.
Edward Melomed.
--
This posting is provided "AS IS" with no warranties, and confers no rights.
No comments:
Post a Comment